Municipal Engineering

Grand Canyon Boulevard
This project consisted of the widening of a 3-lane major collector street to 5 lanes, waterline replacement, select curb and gutter replacement, sidewalk ramp replacement, and pavement markings. In addition, two new stop-controlled intersections were introduced to provide speed calming for the road. Woodson provided topographic survey, design, ADEQ permitting, bid phase services, construction phase services, and as-builts. Woodson also coordinated with ADOT, to utilize the HURF Exchange program for project funding assistance.
Apache Sewer Parallel
The Apache Sewer Parallel provides the City of Winslow with increased sewer capacity for the future. A key component of this project is boring a 48-inch sleeve under Interstate 40 for a new line that must have a slope of only 0.09%.

Water and Wasterwater